Skip to main content

Miami-Dade · Broward · Palm Beach

Opening a location in South Florida? One local contractor for the whole low-voltage buildout.

Structured cabling, fiber, Wi-Fi, cameras and access control from a licensed Miami crew — scoped, quoted and documented so you never have to fly in. Serving South Florida since 2017. Lic. EC13006365.

  • Walkthrough within 2 business days of your call
  • Written scope and a fixed, line-by-line quote
  • COI, license and W-9 on file before we mobilize
Call (305) 239-3751
Insured
General liability and workers' comp; COI issued to your building and GC
Since 2017
Serving South Florida businesses
Project types
Multi-site retail, fuel stations, schools, warehouses, offices

Get a fixed quote

Send the site and what you know — walkthrough in two business days, written scope and a fixed quote after that.

We reply within one business day. No spam, no sharing your details.

How we work with remote teams

Built for teams managing the project from out of town.

  • Corporate IT & facilities
  • GCs & PMs who need a local sub
  • Multi-site rollouts
  1. Walkthrough within 2 business days

    We go to the site, measure the runs and photograph existing conditions. You get the photos the same day.

  2. Written scope and a fixed, line-by-line quote

    No allowances, no "TBD". Compare it against anyone else's and know exactly what's in it.

  3. COI and license on file before we mobilize

    Certificate of insurance to the building and your GC, W-9 on request, Florida license EC13006365.

  4. Badged techs, nights and weekends

    Phased around the other trades and the building's rules, so the space stays usable.

  5. Photo progress updates

    Pulls, terminations, rack work: photographed and sent as milestones close, so you're never guessing.

  6. As-builts, labeling and test results at hand-off

    Every run tested, labeled on both ends and documented. Warranty in writing.

  7. One point of contact from quote to close-out

    The person who scopes the job runs the job and closes it out.

Recent work

Clean racks, labeled runs, tested terminations.

See the portfolio →

Local knowledge that saves time

The things a local crew already knows.

  • Low-voltage permitting and inspections in Miami-Dade and Broward, including the county/municipal split that trips up out-of-town teams.
  • Class A building rules: COI limits, after-hours work windows, freight elevator and loading-dock scheduling, badge access for crews.
  • Hurricane-rated exterior penetrations, sealed conduit and wind-rated camera and antenna mounts.
  • Bilingual crew (English/Spanish) for coordinating with local GCs, property managers and building engineers.

Multi-site rollouts.

Rolling a standard spec across several locations? You send the spec once. The same crew builds every site to it, you deal with one contact, and each location closes out with its own as-built package — drawings, labels, test results, photos. Other Florida locations on request.

Coverage.

Miami-Dade, Broward and Palm Beach counties, including:

  • Miami
  • Doral
  • Hialeah
  • Medley
  • Miami Gardens
  • Fort Lauderdale
  • Pompano Beach
  • Boca Raton
  • West Palm Beach

FAQ

Questions remote teams ask first.

Request a quote
Do you work with out-of-state GCs and corporate teams?

Yes — it's most of what this page is about. We're used to scoping from drawings and photos, joining remote coordination calls, and reporting in writing. You don't need anyone local to manage us.

Can you start before we have anyone on the ground?

Yes. Send the site address and whatever drawings or drop counts you have. We'll do the walkthrough, send photos and come back with a scope and fixed quote without you flying in.

Do you pull permits?

Yes. We pull the low-voltage permits our scope requires in Miami-Dade and Broward and schedule the inspections. If your GC holds the master permit, we work under it.

What do you need to quote?

Site address, a floor plan or drawing (even a marked-up PDF), drop counts or camera/door counts, and your target date. If you don't have drawings yet, the walkthrough produces what we need.

Do you work nights and weekends?

Yes. Occupied buildings and Class A properties usually require it, and we phase the work around other trades and the building's rules.

Can you provide a COI and W-9?

Yes, before we mobilize. Tell us the certificate holder and any additional-insured wording your GC or building requires.

What documentation do we get at hand-off?

As-built drawings, labeling on both ends of every run, cable test results (and OTDR traces for fiber), equipment list, and the warranty in writing.

What's the typical lead time?

Walkthrough within two business days of your call, quote within a few days after. Mobilization depends on materials and the GC schedule; a single-site office is often on the calendar within two to three weeks.

Call nowRequest a quote